Completion of the PotsPan Project

The Jisc PotsPan project formally concluded today with the submission of the project final report and the closure report required by Jisc. Although there were problems encountered on the way, the primary goal of the project to embed the outcomes of the previous SWANI project were achieved. Even the problems encountered were regarded as useful and positive messages and enriched the final deliverables. The details of the project and its outcomes are presented in the final report shown below:


Pots pan final report from Tony Toole

The outcomes of the PotsPan project were disseminated through the Jisc Design Studio where it had a page as part of the Embedding Benefits Programme. It can be seen to be part of a wider range of embedding benefits projects and broadens the resources available to institutions in developing TEL solutions.  The design studio page is shown below:

 