Thursday 28 March 2013

Draft Final Report

The final report for the PotsPan project as part of the Jisc Embedding Benefits programme is due in draft form by 5th April 2013 and in final form by 17th May. The first draft is shown below.

Tuesday 26 March 2013

PotsPan in the Design Studio

The outcomes of the PotsPan project are now available on the Jisc Design Studio at http://jiscdesignstudio.pbworks.com/w/page/64840266/The PotsPan Project Home Page